Poutès : watch the works planned 2019-2021
3 videos presenting the planned progress of the work (2019-2021) are online on the ERN website and the collaborative website of the New Poutès.
In 2019 the upper parts of the 3 gates will be dismantled and the exit of the fish elevator will be lowered to coincide with the new height of water in the reservoir.
Leave a Reply
Want to join the discussion?Feel free to contribute!